Roslyn Residence II

Village of East Hills

Progress

  1. Design
  2. Permits
  3. Site work and foundation
  4. Framing
  5. Roofing and windows
  6. Rough-ins
  7. Insulation and drywall
  8. Finishes
  9. Complete

Current stage: Rough-ins (plumbing, electrical, mechanical)

  • Work hoursMonday to Friday, 8 AM to 5 PM. Deliveries and dumpster drop-offs and pickups keep the same hours.
  • No-work daysSaturdays, Sundays, and federal and state holidays on which Village offices are closed. Upcoming holiday dates will be posted here.
  • Site contactCall or text 516-317-9020
  • PermitVillage of East Hills Building Permit BP-D-25-140, issued July 2, 2026
  • Coming upUpdates are posted here as work is scheduled.

Site rules

  • No dumpsters, debris, dirt or building materials in the street at any time.
  • Debris goes straight into a container, or is neatly piled and covered.
  • The work area is fully fenced.
  • The building permit card is posted where it can be seen.
  • Erosion and storm water controls are in place before work starts and kept up until the end.
  • Trees in the work area are protected, and grading near them is done by hand.
  • Dust is kept down with water during demolition.
  • Rodent bait is set before demolition and kept up through construction.
  • The site is lit at night.
  • The portable toilet stays at the side or rear of the house.

Questions about this site

Messages go directly to the site contact. You may also call or text 516-317-9020.